Baseline variable | Total | MAP | MSAP to SAP | P value |
---|---|---|---|---|
SIRS | 0.6 ± 0.5 | 0.82 ± 0.4 | 0.5 ± 0.5 | <0.001 |
APACHE II | 5.00 (3.00–8.00) | 3.00 (1.00–5.00) | 8.00 (6.00–10.00) | <0.001 |
BISAP | 1.00 (0.00–2.00) | 0.50 (0.00–1.00) | 1.00 (1.00–2.00) | <0.001 |
Ranson | 2.00 (1.00–3.00) | 1.00 (1.00–2.00) | 3.00 (2.00–4.00) | <0.001 |
Marshall | 0.00 (0.00–1.00) | 0.00 (0.00–0.00) | 1.00 (0.00–2.00) | <0.001 |
LAP | 366.82 (228.11–671.34) | 318.33 (210.01–497.66) | 441.41 (261.13–802.05) | 0.002 |
CMI | 14.25 (7.69–26.21) | 10.04 (5.65–16.73) | 21.06 (11.75–35.80) | <0.001 |
BRI | 3.88 (3.34–4.78) | 3.89 (3.40–4.77) | 3.88 (3.25–4.78) | 0.694 |
VAI | 34.88 (19.67–68.75) | 26.50 (14.75–44.73) | 52.46 (32.19–95.23) | <0.001 |
ABSI | 0.08 (0.08–0.08) | 0.08 (0.08–0.08) | 0.08 (0.08–0.08) | 0.682 |
CVAI | 134.14 (113.89–157.33) | 132.87 (114.51–160.31) | 136.15 (111.35–156.86) | 0.801 |